WIP - Work In Progress (Kennedy-bridge)

Selected for Google Maps and Google Earth

Comments (3)

Wim de Vries on August 31, 2008

Project: Refurbishment and reconstruction of the Kennedy-bridge of Bonn

The Kennedy-Bridge will be broadened from 18,00 m to 26,80 m. The Kennedy bridge is a 394,29 m long steel-construction, consisting of three parts: part direction to Bonn: 99,21 m, part direction to Beuel: 99,21 m, medium part: 195,85 m.

Construction period: February 2007 - February 2010.

Order Value: € 31,2 Mio.

©polytropos on September 4, 2008

What will be finished faster? The Kennedy-Bridge or the Panoramio construction site? ;-)

(Tag it as "Maintenance")

Wim de Vries on September 6, 2008

I think this bridge will e finished poly Panoramio... there's just hope :-)

Tagged

Sign up to comment. Sign in if you already did it.

Photo details

  • Uploaded on August 31, 2008
  • © All Rights Reserved
    by Wim de Vries
    • Camera: Canon EOS 350D DIGITAL
    • Taken on 2008/08/31 07:48:57
    • Exposure: 0.001s (1/1000)
    • Focal Length: 100.00mm
    • F/Stop: f/4.000
    • ISO Speed: ISO100
    • Exposure Bias: 0.00 EV
    • No flash

Groups