Engineered log jam - 200811LJW

Selected for Google Maps and Google Earth

Comments (3)

Larry Workman QIN on November 17, 2008

This is one of the engineered log jams that were completed in October, 2008 during the peak of the first large freshet. See the Quinault Rehab Project tag for related photos.

ai savery on November 22, 2008

In spite of this being sort of a 'documentary' shot, Larry, it has a nice atmosphere and quality about it, with the misted layers. Wonderful subtle coloring, too. This must be a huge project! Greetings from alicia

Larry Workman QIN on November 23, 2008

Hi Alicia.

You are correct that this is a "documentary" shot. I am documenting the work on this pilot project to help reestablish the natural conditions of this portion of the river.

While I could have focused all the attention on the engineered log jam, I decided to show some of the background through the heavy rain that was falling at the time. The last of the yellow on the leaves and different layers of forest and 'hills' stood out in the rain and clouds, so it help set the location.

I took many photo of the project this day, but only posted a few of them. By the time I headed back to the office I was totally soaked.

Best regards, Larry

Sign up to comment. Sign in if you already did it.

Photo details

  • Uploaded on November 17, 2008
  • © All Rights Reserved
    by Larry Workman QIN
    • Camera: NIKON CORPORATION NIKON D300
    • Taken on 2008/11/07 10:53:19
    • Exposure: 0.010s (1/100)
    • Focal Length: 34.00mm
    • F/Stop: f/5.600
    • ISO Speed: ISO250
    • Exposure Bias: 0.00 EV
    • No flash

Groups