Construction of Terminal 3 started on March 28, 2004, and was opened in two stages. Trial operations commenced on February 29, 2008, when seven airlines, namely British Airways, El Al Israel Airlines, Qantas, Qatar Airways, Shandong Airlines and Sichuan Airlines moved into the terminal. 20 other airlines moved into the terminal when it became fully operational on March 26, 2008[12]. Currently, it mainly houses Air China, Oneworld, Star Alliance, and other domestic and international flights.
It was designed by a consortium of NACO (Netherlands Airport Consultants B.V), UK Architect Foster and Partners and ARUP. Lighting was designed by UK lighting architects Speirs and Major Associates. The budget of the expansion is US$3.5 billion. Far grander in size and scale than the existing terminals, it was the largest airport terminal-building complex built in a single phase with 986,000 square meters in total floor area at its opening. It features a main passenger terminal (Terminal 3C), two satellite concourses (Terminal 3D and Terminal 3E) and five floors above ground and two underground, with the letters "A and B" omitted to avoid confusions with the existing Terminals 1 and 2. Terminal 3C is dedicated for domestic flights, Terminal 3E for international flights, and Terminal 3D, called the "Olympics Hall", was used for charter flights during the Beijing Olympics, before its use by international flights.
Terminal 3 is larger than London Heathrow Airport's 5 terminals combined with another 17% to spare.
Terminal 3 of the BCIA is currently the second largest airport passenger terminal building of the world. Its title as the world's largest was surrendered to Dubai International Airport's Terminal 3 (over 1,500,000 m²) on October 14, 2008.