ngoma-kachikau 公路项目

Selected for Google Maps and Google Earth

Comments (1)

wang202910 on November 12, 2010

博茨瓦纳 ngoma-kachikau 38公里公里项目 k4+500施工的透层,现在这里是雨季,每天上午晴天。中午多云,下午4点以后就下雨。

Sign up to comment. Sign in if you already did it.

Photo details

  • Uploaded on November 11, 2010
  • © All Rights Reserved
    by wang202910
    • Camera: SONY DSC-T900
    • Taken on 2010/11/08 16:55:30
    • Exposure: 0.006s (1/160)
    • Focal Length: 6.18mm
    • F/Stop: f/3.500
    • ISO Speed: ISO160
    • Exposure Bias: 0.00 EV
    • No flash

Groups