Dr. F. Tudjman Bridge & Port of Gruž, DUBROVNIK

Selected for Google Maps and Google Earth

Construction preparations of this cable-stayed bridge began in 1989, but was completed in 2002 due to the Serbo-Montenegrin

invasive attacks, 1991-1995. Was built in 3.5 years, 518 m long, the longest span 304.5 m, 14.2 m wide, 50.3 m high, eastern

pylon 141.5 m high. Cable-stayed bridge was invented (16th century) by Croatian polymath (linguist, inventor, diplomat,

engineer, priest) and bishop Faust Vrančić (Fausto Veranzio, Faustus Verantius, Verancsics Faustus).

Show more
Show less
Save Cancel Want to use bold, italic, links?

Comments (121)

Zlatan Olić on May 16

hvala!

Sign up to comment. Sign in if you already did it.

Photo details

  • Uploaded on February 2, 2013
  • © All Rights Reserved
    by Zlatan Olić

Groups