Coffer Dam of Fabric

Not selected for Google Earth or Google Maps after a second review [?]

Comments (2)

Brownhills George on May 10, 2013

The Canal was only Drained in between the Coffer Dams these were constructed from scaffold poles and a waterproof fabric. The construction of the bridge took several months and the canal needed to be drained to construct the stronger foundations. The piles and Shuttering were about 6 meters/20 ft long.

Mick_P on May 27, 2013

Good info, Thanks George. Credit to you for documenting all these things, stuff that I'm sure many people at the time thought were irrelevant but that have real historical interest - especially the buildings now long gone.

Sign up to comment. Sign in if you already did it.

Photo taken in Clayhanger, Walsall, West Midlands WS8, UK